PROJECT ESTIMATOR & SCHEDULE LOCK-IN

Run your structural building parameters through our live production algorithm, review pre-construction technical inquiries, and transmit drawings directly to Gabriel for an ironclad 24-hour bid.

01

CALCULATE YOUR ERECTION VELOCITY

Adjust your parameters below to simulate required crane tonnage, connector gang sizing, and estimated weeks on-site based on GS Steel Group field production metrics.

PROJECT SPECIFICATIONS REAL-TIME TELEMETRY
85,000 SQ FT
15,000 SQ FT 400,000+ SQ FT
420 TONS
50 TONS 3,000 TONS
ENGINEERED PRODUCTION FORECAST GS BENCHMARK ALIGNED
ESTIMATED ERECTION TIMELINE
3.5 WEEKS
approx. 18 active erection days on site
RECOMMENDED CRANE FLEET
90-TON HYDRAULIC
+ (2) 80FT BOOM LIFTS
FIELD CREW SIZING
10 IRONWORKERS
Connectors, Riggers & Deck Gang
EST. STRUCTURAL BOLTS
8,400
A325 / A490 High-Strength
DAILY DECKING VELOCITY
22,000 SQ FT/D
Diaphragm pinned & fastened

Ready to lock this timeline into your master construction schedule?

02

THE TECHNICAL SPEC: QUESTIONS GENERAL CONTRACTORS ASK

Straightforward answers regarding crew mobilization, crane logistics, airspace permits, and field welding tolerances.

Our core rigging crews and cranes mobilize within 5 to 10 calendar days of anchor bolt survey sign-off. We perform our independent 3D laser plumb audit 48 hours prior to steel arrival to ensure foundation tolerances are sub-millimeter before the first crane outrigger touches down.

Yes. We control dedicated all-terrain cranes (up to 130-ton), rough-terrain hydraulic truck cranes, and high-reach JLG boom lifts (80ft to 125ft). We do not broker equipment to third parties — your master schedule is completely independent of rental house shortages.

Gabriel and our in-house engineering staff calculate all 3D crane lift studies per ASME B30.5 standards, including crane radii, boom deflections, center-of-gravity rigging calculations, ground bearing pressure pads, and FAA Notice of Proposed Construction (Form 7460-1) where airspace permits apply.

We monitor continuous on-boom anemometer feeds. Crane picks are paused when sustained winds exceed 18 knots (20 mph) or gust thresholds specified in the pick plan. However, our deck crews shift immediately to bolt torque lock-in, plumbing guy-line adjustments, and ground shaking-out so zero jobsite hours are wasted.

Yes. Every crew lead and connector carries active AWS D1.1 (Structural Welding Code – Steel) and D1.3 (Sheet Steel Decking) certifications. If a fabricator hole requires field reaming, gusset plate stiffening, or moment connection welding, our certified riggers execute and log the repair immediately.

A FIRM HANDSHAKE. AN UNBREAKABLE SCHEDULE.

When Gabriel commits to your erection start date, that date is cast in iron. We don't overbook our crews, we don't pull men off your job to patch another contractor's fire, and we don't leave you stranded with empty anchor bolts.

GABRIEL'S DIRECT DISPATCH LINE (800) 555-GS-STEEL Direct mobile access for General Contractors & Project Managers
AISC Advanced Certified Erector (Cat 3)
OSHA 30 Hour Certified Rigging Foremen
Full Comprehensive Rigging Liability & Inland Marine Insurance
Rapid 24-48 Hour RFQ & Blueprint Review
LOCK IN YOUR SCHEDULE // BID REQUEST SUBMIT SPECIFICATIONS DIRECT TO GABRIEL
DRAG & DROP DRAWINGS (PDF, CAD, DWG) OR BROWSE Plans analyzed personally by Gabriel within 24 hours